The Mississippi River and Tributaries Project |
The Mississippi Drainage Basin
The Project Flood
The flood control plan is designed to control the "project flood." It is a flood larger than the record flood of 1927. At Cairo, the project flood is estimated at 2,360,000 cubic feet per second (cfs). The project flood is 11 percent greater than the flood of 1927 at the mouth of the Arkansas River and 29 percent greater at the latitude of Red River Landing, amounting to 3,030,000 cfs at that location, about 60 miles below Natchez.
Description of Plan
Main Stem Levees
Floodways
Channel Improvement and Stabilization
Cutoffs | Shortening the river and reduce flood heights. |
Revetment | Controlling the river's meandering. |
Dikes | Directing the flow. |
Improvement
Dredging |
Realigning the channel. |
The Corps Dredge Jadwin at work. | Mississippi River revetment construction. |
Principal Tributary Basin Improvements
Old River Control
Navigation
|
The MR&C Project Area. View larger map (205 kb) |
|
The Climate Change and Public Health Law Site
The Best on the WWW Since 1995!
Copyright as to non-public domain materials
See DR-KATE.COM for home hurricane and disaster preparation
See WWW.EPR-ART.COM for photography of southern Louisiana and Hurricane Katrina
Professor Edward P. Richards, III, JD, MPH - Webmaster
Provide Website Feedback - https://www.lsu.edu/feedback
Privacy Statement - https://www.lsu.edu/privacy
Accessibility Statement - https://www.lsu.edu/accessibility